project 1

Location: Harlingen, TX

 

Site: Approx. 80 Acres


​Capacity:  700 MW; will supply the power needs of approximately 700,000 homes in the Rio Grande Valley


Technology:  GE 7FA .05 Combined-Cycle Gas Turbines


Fuel:  Natural Gas; served from local pipeline transmission networks


Air Permits Received:  TCEQ – February 2013; EPA – March 2014


Construction Time:  Approximately 24 – 30 Months


Anticipated Completion: 3Q, 2017


Local Benefits include:

  • The Projects development and construction will generate $1.4 billion in economic output from the construction activity.

  • The Project will support 3,342 direct, indirect and induced construction jobs during the multi-year construction period.

  • The Project will generate $379 million in direct, indirect, and induced construction salaries for area workers.

  • Once the plant is operating, the facility will employ 25-30 workers with very attractive annual salaries of about $75,000.

  • Will utilize the most recent advanced emissions-control technology, which will make it one of the cleanest natural gas-fueled power plants in Texas

Location: 1002 East Park Avenue, Lufkin, TX

 

Site:  Approx. 80 Acres


Capacity:  730 MW; will supply the power needs of approximately 700,000 homes in East and Central Texas


Technology:  Combined-Cycle Gas Turbines


Fuel:  Natural Gas; served from local pipeline transmission networks


Air Permits Received:  TCEQ – November, 2013; EPA – July 2014


Construction Time:  Approximately 24 – 30 Months


Anticipated Completion:  3Q, 2017


Local Benefits include:

  • The Projects development and construction will generate $1.4 billion in economic output from the construction activity.

  • The Project will support 3,342 direct, indirect and induced construction jobs during the multi-year construction period.

  • The Project will generate $379 million in direct, indirect, and induced construction salaries for area workers.

  • Once the plant is operating, the facility will employ 25-30 works with very attractive annual salaries of about $75,000.

  • Will utilize the most recent advanced emissions-control technology, which will make it one of the cleanest natural gas-fueled power plants in Texas.